1. A toy manufacturer ships toys from three plants to three regional distribution centers. The shipping costs per carload, plant capacities (in carloads) and demands (in carloads) are given below. Solve the problem and report your transportation assignments, including the total transportation cost.

Center 1 2 3
Plant
A 4 10 6
B 8 16 6
C 14 18 10

Plant Capacities Center Demands
A 100 1 200
B 300 2 300
C 300 3 200

2. A company produces concrete blocks at three plants. It ships these blocks to each of four construction sites for use in building shopping malls. Given below are the shipping costs (in dollars per truckload from Plant X to Site Y), the capacities for each plant (in truckloads) and the demand of each site (in truckloads). Solve the problem and report your transportation assignments, including the total transportation cost.

Site–> 1 2 3 4
Plant
A 5 12 7 0
B 4 6 7 6
C 2 8 5 3

Plant Capacities Site Demands
A 50 1 40
B 50 2 20
C 60 3 30
4 70

Note: Currently, Regular Priority times are 3-5 days. Log in to upload files with your questions. Tutorials you buy shall be emailed to your PAYPAL email. Talking about quality references: finding and referencing an (n+1)th article for your tutorial requires substantially more time than the (n)th article referenced, therefore you will see the price increasing with the number of references you require in some questions. Wanted to contact us over something related to this question? Email us: support AT oxenmine.com.