A production process at Kenneth Day Manufacturing is shown in Figure S7.9.
The drilling operation occurs separately from, and simultaneously with, the
sawing and sanding operations. A product needs to go through only one of the
three assembly operations (the operations are in parallel).

a) Which operation is the bottleneck?

b) What is the process time of the overall system?

c) What is the process cycle time of the overall system?

d) If the firm operates 8 hours per day, 20 days per month, what is the monthly
capacity of the manufacturing process?

(S7.15)

SEE ATTACHED FILE FOR FIGURE S7.9

PLEASE USE AN EXCEL SPREADSHEET FOR RESPONSE.

Note: Currently, Regular Priority times are 3-5 days. Log in to upload files with your questions. Tutorials you buy shall be emailed to your PAYPAL email. Talking about quality references: finding and referencing an (n+1)th article for your tutorial requires substantially more time than the (n)th article referenced, therefore you will see the price increasing with the number of references you require in some questions. Wanted to contact us over something related to this question? Email us: support AT oxenmine.com.